STS-81

STS-81
Mission insignia
Mission statistics
Mission name STS-81
Space shuttle Atlantis
Launch pad 39-B
Launch date 12 January 1997, 09:27:23 UTC
Landing 22 January 1997, 14:23:51 UTC, KSC, Runway 33
Mission duration 10 days, 4 hours, 56 minutes, 30 seconds
Number of orbits 160
Orbital altitude 296 kilometres (184 mi)
Orbital inclination 51.60 degrees
Distance traveled 6,100,000 kilometres (3,800,000 mi)
Crew photo
Related missions
Previous mission Subsequent mission
STS-80 STS-82

STS-81 was a January 1997 Space Shuttle Atlantis mission to the Mir space station.

Contents

Crew

Position Launching Astronaut Landing Astronaut
Commander Michael A. Baker
Fourth spaceflight
Pilot Brent W. Jett, Jr.
Second spaceflight
Mission Specialist 1 Peter J.K. Wisoff
Third spaceflight
Mission Specialist 2 John M. Grunsfeld
Second spaceflight
Mission Specialist 3 Marsha S. Ivins
Fourth spaceflight
Mission Specialist 4 Jerry M. Linenger
EO-22
Second spaceflight
John E. Blaha
EO-22
Fifth spaceflight

Mission parameters

Fifth Mir docking mission

Mission highlights

STS-81 was the fifth of nine planned missions to Mir and the second one involving an exchange of U.S. astronauts. Astronaut John Blaha, who had been on Mir since 19 September 1996, was replaced by astronaut Jerry Linenger. Linenger spent more than four months on Mir. He returned to Earth on Space Shuttle Mission STS-84.

Atlantis carried the SPACEHAB double module providing additional middeck locker space for secondary experiments. During the five days of docked operations with Mir, the crews transferred water and supplies from one spacecraft to the other. A spacewalk by Linenger and one of his Russian cosmonaut crewmates occurred after the departure of Atlantis.

The STS-81 mission included several experiments in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, microgravity, and space sciences. It was hoped that data would supply insight for the planning and development of the International Space Station, Earth-based sciences of human and biological processes, and the advancement of commercial technology.

STS-81 involved the transfer of 2,710 kilograms (6,000 lb) of logistics to and from the Mir, the largest transfer of items to date. During the docked phase, 635 kilograms (1,400 lb) of water, 516.1 kilograms (1,138 lb) of U.S. science equipment, 1,000.7 kilograms (2,206 lb) of Russian logistics along with 121.7 kilograms (268 lb) of miscellaneous material was transferred to Mir. Returned to Earth aboard Atlantis was 570.0 kilograms (1,257 lb) of U.S. science material, 404.5 kilograms (892 lb) of Russian logistics and 97.3 kilograms (215 lb) of miscellaneous material.

First Shuttle flight of 1997 highlighted by return of U.S. astronaut John Blaha to Earth after 118-day stay aboard Russian Space Station Mir and the largest transfer to date of logistics between the two spacecraft. Atlantis also returned carrying the first plants to complete a life cycle in space — a crop of wheat grown from seed to seed. This fifth of nine planned dockings continued Phase 1B of the NASA/Russian Space Agency cooperative effort, with Linenger becoming the third U.S. astronaut in succession to live on Mir. Same payload configuration flown on previous docking flight — featuring SPACEHAB Double module — flown again.

Blaha joined Mir 22 crew of Commander Valeri Korzun and Flight Engineer Aleksandr Kaleri on 19 September 1996, when he arrived there with the crew of STS-79. Linenger worked with the Mir 22 crew until the arrival in February of the Mir 23 crew of Commander Vasili Tsibliev, Flight Engineer Aleksandr Lazutkin and German researcher Reinhold Ewald. Ewald returned to Earth with the Mir 22 cosmonauts after a brief stay on the station. Astronaut Michael Foale replaced Linenger on Mir when the STS-84 mission arrived in May 1997.

Docking occurred at 22:55 EST, 14 January, followed by hatch opening at 00:57 January 15. Linenger officially traded places at 04:45 with Blaha who spent 118 days on the station and 128 days total on-orbit. During five days of mated operations, crews transferred nearly 6,000 pounds (2,722 kilograms) of logistics to Mir, including around 725 kilograms (1,600 lb) of water; around 516 kilograms (1,140 lb) of U.S. science equipment; and 1,001 kilograms (2,210 lb) of Russian logistical equipment. About 1,100 kilograms (2,400 lb) of materials returned with Atlantis from Mir.

Crew also tested on Shuttle the Treadmill Vibration Isolation and Stabilization System (TVIS), designed for use in the Russian Service Module of the International Space Station. Another activity related to International Space Station involved firing the orbiter's small vernier jet thrusters during mated operations to gather engineering data.

Undocking occurred at 09:15 EST, 19 January, followed by fly around of Mir.

No significant in-flight anomalies were experienced with Atlantis.

Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15.[1] Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[1][2]

Flight Day Song Artist/Composer
Day 2 "Free Ride" The Edgar Winter Group
Day 3 "It Keeps You Runnin’" The Doobie Brothers
Day 4 "Hitchin’ a Ride" Vanity Fare
Day 5 "Celebration" Kool and the Gang
Day 6 "I Got You (I Feel Good)" James Brown
Day 7 "Mack the Knife" Bobby Darin
Day 8 "Ticket to Ride" The Beatles
Day 9 "My Favorite Marcia" The Allison Brown Quartet
Day 10 "The Banana Boat Song" Harry Belafonte

See also

References

  1. ^ a b Fries, Colin (25 June 2007). "Chronology of Wakeup Calls" (PDF). NASA. http://history.nasa.gov/wakeup%20calls.pdf. Retrieved 13 August 2007. 
  2. ^ NASA (11 May 2009). "STS-81 Wakeup Calls". NASA. 

External links